East Lyme Public Schools
Home /
For Parents & Students / ELPS Elementary Facilities - Our Path Forward
page tools :
email page print page small type large type

ELPS Elementary Facilities

Our Path Forward

Community Forum Elementary Schools Presentation 6/24/13

Facilities Vision Task  Forum Findings Report to BOE 4/23/13

     Appendix A - ELPS Priority Action List (2/13/11)
     Appendix B - ELPS Mission Statement (8/22/11)
     Appendix B - ELPS Long Range Plan Goals and Objectives (9/24/12))
     Appendix C - ELPS Facilities Vision Committee Summary (10/19/11)
     Appendix D - ELPS Feasibility Study Facilities Options (4/4/13)
     Appendix E - ELPS Community Forum Findings (10/3/12)
     Appendix F - Elementary Student Survey Findings (10/12/12)
     Appendix F - Middle School Student Survey Findings (9/5/12)
     Appendix G - Elementary Teacher Survey Findings 6/18/12)

Waterford Public Schools "Five Elementary Schools to Three" Presentation
(Select " Five Elementary Schools to Three" link towards bottom of webpage.)

  

East Lyme Request for Qualifications

Request for Qualifications (RFQ) - East Lyme Public Schools (posted 9/21/13)

Request for Qualifications Architectural and Engineering Design Services for the East Lyme Elementary Schools Project (posted 9/21/13)

 

.00 Cover
.10 TOC 922
1.0         Tab
1.1-1.2 Executive Summary
2.0 Tab
2.1 Study- Code Analysis
2.2A Existing Site Report
2.2B Existing Architectural Report
2.2C Existing Window Conditions Report
2.2E Structural Evaluation of Existing Conditions Report
2.2F Existing MEP Summary
2.2G Haz Materials
2.3 Plan
2.3A Central Office Priority List
 
 
3.0 Tab
3.1 Flanders Code Analysis
3.2A Existing Site Report
3.2B Existing Architectural Report
3.2C Existing Window Conditions Report
3.2D Existing Roof Conditions Report
3.2E Structural Evaluation of Existing Conditions Report
3.2F Existing MEP Summary
3.2G Haz. Materials
3.3A FLANDERS EXISTING SITE PLAN
3.3B FLANDERS EXISTING PLAN
3.3C FLANDERS PLAN SCHEME 2
3.4A Flanders Priority List
3.4B eastlyme-flanders
3.4C new.flanders.school
3.5A 11.19.10 Principal Flanders
3.5B Questionnaires
3.5B1 45-01
3.5B2 NCLB_flanders_school
 
4.0 Tab
4.1 Code Analysis
4.2A Existing Site Report
4.2B Existing Architectural Report
4.2C Existing Window Conditions Report
4.2D Existing Roof Conditions Report
4.2E Structural Evaluation of Existing Conditions Report
4.2F Existing MEP Summary Niantic
4.2G Haz. Materials
4.3A NIANTIC EXISTING SITE PLAN
4.3B NIANTIC EXISTING PLAN
4.4A Niantic Priority List
4.4B eastlyme-niantic RAN
4.5A 11.15.10 Principal Niantic
4.5B Questionnaires
4.5B1 45-02
4.5B2 NCLB_niantic_center_school
 
5.0 Tab
5.1 Code Analysis
5.2A Existing Site Report
5.2B Existing Architectural Report
5.2C Existing Window Conditions Report
5.2D Existing Roof Conditions Report
5.2E Structural Evaluation of Existing Conditions Report
5.2F Existing MEP Summary Haynes
5.2G Haz. Materials
5.3A LILLIE EXISTING SITE PLAN
5.3B LILLIE EXISTING PLAN
5.3C LILLIE PLAN SCHEME 2
5.4A Lillie B. Haynes Priority List
5.4B eastlyme-LillyB_RAN
5.5A 11.19.10 Principal Lillie
5.5B Questionnaires
5.5B1 NCLB_lillie_hayne_school
5.5B2 45-04
 
6.0 Tab
6.1 Code Analysis
6.2 0A MS Plan
6.2 0B MS Plan
6.2 0C MS Plan
6.2 1A MS Plan
6.2 1B MS Plan
6.2 1C MS Plan
6.2 1D MS Plan
6.2 1E MS Plan
6.2 1F MS Plan
6.2 2A MS Plan
6.2 2B MS Plan
6.2 2C MS Plan
6.2A Existing Site Report
6.2B Existing Architectural Report
6.2C Existing Window Conditions Report
6.2D Existing Roof Conditions Report
6.2E Structural Evaluation of Existing Conditions Report
6.2F Existing MEP MS
6.2G Haz. Materials
6.3A MS Priority List
6.4A Questionnaires
6.4B1 NCLB_east_lyme_middle_school
6.4B2 45-51
 
7.0 Tab
7.1 Code Analysis
7.2 1A HS Plan
7.2 1B HS Plan
7.2 1C HS Plan
7.2 1D HS Plan
7.2 1E HS Plan
7.2 1F HS Plan
7.2 1G HS Plan
7.2 2A HS Plan
7.2 2B HS Plan
7.2 2E HS Plan
7.2 2F HS Plan
7.2 2G HS Plan
7.2A Existing Site Report
7.2B Existing Architectural Report
7.2C Existing Window Conditions Report
7.2D Existing Roof Conditions Report
7.2E Structural Evaluation of Existing Conditions Report
7.2F Existing MEP HS
7.2G Haz. Materials
7.3A HS Priority List
7.4B1 NCLB_east_lyme_high_school
7.4B2 45-61
 
8.0 Tab
8.1A district Priority List
8.2 Elementary Schools Site and Floor Plans
8.2A Options
8.2B eastlyme-flanders
8.2C new.flanders.school
8.2D new.school
8.2E Niantic
8.2F Lillie B.
8.3 HVAC summary report
8.4 East Lyme Classroom-student charts
8.5 Dist-Public_School_Enrollment_PK-12_by_Grade
 
9.0 Tab
9.1A 10.03.10 Superintendent Flanders
9.2A spstdsws
9.2B allperc
9.2C (11) Dist-Public_School_Enrollment_PK-12_by_Grade
9.2C Enrollment – Enrollment by Year Report
9.2D ATT00028
9.2D FY12 EST vs FY11 Actual enrollment at 9-30-10
9.2E 45-00
9.2F East Lyme
9.2G el schools
9.2H Roof Warranties

 

 


powered by finalsite